Service detail

Last updated: September 2026

Connect your systems with an integration you can operate

Replace a repeated copy-and-paste step with a defined API flow. Start with endpoint access, example records, field rules and an owner for failures.

Full DX Integration: £30,000-£42,000 · 6 weeks

01

One system handoff, end to end

A useful first integration connects a specific business event to a result someone can verify. In this example, an approved request creates or updates a CRM record and the operations team can see its delivery status.

  • Agree the source event, destination endpoint and stable record identifier.
  • Keep field mapping and approval rules explicit. Missing information should remain visible.
  • A repeated event follows an agreed duplicate policy; a failed update has a recovery owner.
02

What the delivery contains

The integration includes the information your team needs to understand the flow and operate the agreed environment. The exact endpoint count and supported events are fixed before work begins.

  • A source-to-destination field map with required fields and validation rules.
  • The implemented API flow, authentication configuration and example requests.
  • A record of successful, rejected and failed operations with useful identifiers.
  • Checks for the agreed normal, duplicate and failure cases, plus setup and recovery notes.
03

Acceptance includes the failure path

The main demonstration is an approved request arriving in the correct destination record. The review also exercises the conditions that otherwise turn into manual investigation after launch.

  • Repeat the same event and confirm the agreed duplicate behavior.
  • Send a missing required field and confirm that the problem is explained without a false success.
  • Make the destination unavailable in a controlled test and inspect the retry or manual recovery path.
  • Check that an operator can identify the affected record without exposing credentials in logs.
04

Bring access and real field rules

Start with API documentation, representative redacted records and someone who owns each system. If production access is unavailable, agree what a sandbox or mocked endpoint can prove.

  • Confirm authentication, permission boundaries and provider limits.
  • Identify which system is authoritative when values disagree.
  • Provide an example of an update, a duplicate and an invalid record.
  • Name the person who can approve field mapping and review the first demonstration.
05

Scope the operational boundary

The package is a starting point. We confirm inputs, access, exclusions, timing and price in writing. A single handoff should not carry an unstated promise to replace either system.

  • A new CRM, broad historical migration and unconfirmed third-party access are outside the initial scope.
  • Additional endpoints, two-way reconciliation and new event types need an explicit scope decision.
  • Hosting, provider charges, ongoing support and incident ownership are agreed separately where applicable.
06

Leave with a flow your team can follow

At handover, walk through one successful event and one recovery using the operating notes. Record any remaining limitations and the next environment decision.

  • Confirm who owns credentials and receives operational alerts.
  • Identify the reviewed build and retain the example records used for acceptance.
  • Review deployment, rollback and monitoring requirements before enabling production traffic.

Delivery examples

Inspect the deliverables before you commit

Filled-in examples show how the scope and review evidence are documented.

Buyer FAQs

Can you connect systems that have no public API?

We first check the supported interfaces and access available. An export/import flow may be a better first scope. We do not promise an integration around an interface that has not been confirmed.

Does this include migrating all our historical data?

Only if the migration, validation and recovery work are explicitly included. A live event flow and a historical migration have different volume and reconciliation requirements.

Can the first version run in our environment?

Bring the environment requirements before scoping. Deployment access, dependencies, security review and the operating owner affect the agreed delivery.

How do we handle a later change to a field or endpoint?

The handover records the mappings and assumptions. A later provider or schema change can be assessed against them and handled through an agreed maintenance or new-scope arrangement.

Scope the first sprint

Bring the app, API, LLM feature, or AI workflow you want to test. We will turn it into a clear first-sprint scope.

Start a conversation